RRS 2025-2028

55 Setting and Sheeting Sails

55.1 Changing Sails When headsails or spinnakers are being changed, a replacing sail may be fully set and trimmed before the replaced sail is lowered. However, only one mainsail and, except when changing, only one spinnaker shall be carried set at a time.

55.2 Spinnaker Poles; Whisker Poles

Only one spinnaker pole or whisker pole shall be used at a time except when gybing. When in use, it shall be attached to the foremost mast spar (as defined in The Equipment Rules of Sailing).

55.3 Sheeting Sails

No sail shall be sheeted over or through any device that exerts outward pressure on a sheet or clew of a sail at a point from which, with the boat upright, a vertical line would fall outside the hull or deck, except:

55.4 Headsails and Spinnakers

For the purposes of rules 54 and 55 and Appendix G, the definitions of ‘headsail’ and ‘spinnaker’ in The Equipment Rules of Sailing shall be used. Note: The Equipment Rules of Sailing are available on the World Sailing website.